TOIVISION
DRILLING LOG
I
Southwestern
1. PROJECT
GIWW Colorado River - Matagorda Bay
2. LOCATION
(Coordinates or Station)
3. DRILLING AGENCY
Dept of the Army, GD, Corps of Engineers
4~
HOLE NO.
(As shown on drawing title
andlUe number)
5. NAME OF DRILLER
Black
6. DIRECTION OF HOLE
3ST-B
o VERTICAL
0
INCUNEO
PEG. FROM VERT.
7. THICKNESS OF OVER8URDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH Of HOLE
ELEVATION
DEPTH
LEGEND
22.0
CLASSIFICATION OF MATERIALS
(Description)
Hole No. 3ST-B
INSTALLATION
Galv Dist, Eng Div
TsHEET
IOF
SHEETS
10. SIZE AND TYPE OF 81T
11. DATUM FOR ELEVATION SHOWN
(TBM
or
MSL)
Sta. 472tOOO.South Side Channel
12. MANUFACTURER'S DESIGNATION OF DRILL-
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
14. TOTAL NUMBER CORE BOXES
1'5. ELEVATION GROUND WATER
: STARTED
: DISTURBED
:2
T~'r~
16. DATE HOLE
i
30 Nov
17. ELEVATION TOP Of HOLE
18. TOTAL CORE RECOVERY FOR BORING
19. SIGNATURE OF INSPECTOR
1
UNDISTURBED
: COMPLETED
i
30 Nov 66
% CORE
RECOV.
ERY
BOX OR
REMARKS
SAMPLE
(n,-i/ling lime, water loss, depth of
NO.
weathering, elc., if significant)
b
d
e
9
0.0
15.0
1B.0
20.0
15.
Water
lB.
Gray mucky clay v/soft
Penetrated w/ke11y and weig
2 drill rods
Jar 1
20.
Brown silty sand, loose
Jar 2
22.
Same as above,
1 blow