Hole No.
3ST-17
TOIVISION
DRILLING LOG
I
Southwestern
INSTALLATION
Ga1v Dist, Eng Div
TSHEET
IOF
SHEETS
1. PROJECT
10. SIZE AND TYPE OF BIT
C'TI.1T.1
"'~olorado
River -Matagorda Bav
11. DATUM FOR ELEVATION SHOWN
(TBM
or
MSL)
2. LOCATION
(Coordinates or Station)
Sta.
496100
North Bank, Offset 15.0' North
3. DRILLING AGENCY
Dept of the Army, GD, Corps of Engineers
4. HOLE NO.
(As shown on drawing title
and file number)
5. NAME OF DRILLER
Black
6. DIRECTION OF HOLE
o
VERTICAL
D INCLINEO
7.
THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
.
:3ST-17
oro. FROM VERT.
??
<
12. MANUFACTURER'S DESIGNATION Of DRILL
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
14. TOTAL NUMBER CORE BOXES
'-5.
ELEVATION GROUND WATER
: STARTED
: DISTURBED
: 2 Jars
16. DATE HOLE
:
7 Dec
17. ELEVATION TOP OF HOLE
18. TOTAL CORE RECOVERY fOR BORING
19. SIGNATURE Of INSPECTOR
: UNDISTURBED
:
1 Cont
: COMPLETED
:
7 Dec 1966
CLASSifiCATION Of MATERIALS
(Desrription)
%
CORE
RECOY.
ERY
BOX OR
SAMPLE
NO.
REMARKS
ELEVATION
DEPTH
0
b
0.0
14.0=
14.0
IlS.~
lS.O
120.iJ-
20.0
122.5-
ENG FORM 1836
1 APR 63
LEGEND
d
Water
Gray
clay, no resistance
Kelly and 2 rods, v/soft
Gray clay, w/large amount
of oyster shell, v/soft
Brown clay, v/stiff