    1. PROJECT
    DEPARTMENT OF THE
    ARMY
    DIVISION
    Southwestern
    INSTAllATION Galv Dist, Eng Div
    Viola Ship Channe 1
    SHElT
    OF
    2. LOCATION
    (coor .,..,.. or
    S
    .tJOn)
    -----I
    DR ILLI NG
    LOG
    11' HoLE
    No.-rA••h.,.,,,
    on du.ln,
    TIt]•
    • iiillrr.
    N0.)
    3ST-l2
    6'
    DIRECTION OF HOLE
    [-
    IOEGREES WIT"
    c:J VERTICAL
    C::J INClINEO
    VERTICAl
    Sta. 1520tOO centerline
    ri
    '--j
    3' DRILLING AGENCY
    U. S. Army Corps of Engineers
    '?l ";
    5. NAME OF DRILLER
    Ross
    7. TH ICKNESS
    OF OVE!!""
    BURDEN
    1
    8
    '
    DEPTH
    J
    9. TOTAL
    DRILLED
    DEPTH
    Of
    INTO ROCK
    HOLE
    10. SIZE AND TYPE OF BIT
    111.
    DATUM FOR ELEVATION SHOWN
    112 .
    MANUFACTURER'S DESIGNATION OF DRILL
    (TBM
    or
    MSL)
    47.5
    13' TOTAL NO. OF OVERBURDEN SAMPLES TAKEN
    '14.
    TOTAL
    If5'
    [LEV.
    16.
    DATE HOL
    o
    STU.BEO
    UN
    NO. CORE
    GROUND
    S1.A.f'
    T
    lO
    C2~PlETEO
    196
    BOXE
    WATER
    <! 1
    DeC
    <! 1
    Dec
    1
    17.ELEV. TOP OF HOLE
    ELEVATIONI
    DEPJ"H ..ILEGENI
    -/"
    -
    0.0
    40.0
    41.0
    f?:;
    7
    \
    _. '
    .
    ./
    It,rr.:tt
    r?~:A"::'
    41:0-
    A"?
    ..
    C,'._
    45.5-J
    45.5
    I
    i
    ~:,i;
    47.S.
    47.5
    I
    t" I.
    VI
    18' TOTAL CORE RECOVERy FOR
    80RING (")
    19. SIGNATURE OF INSPECTOR
    CLASSIFICATION OF MATERIALS
    (D~.er
    ipt
    ion)
    IT. COR, BOX
    O~
    IH.I"IAI'C "'.;)
    RECOV
    $AMPl
    (DrJIlln, fig,
    •• ter
    loa ••
    d.ptll
    01
    ERY
    tlO'
    •••
    therln.: •
    • te .•
    JI
    .1,nUle."t)
    Water
    Top 0.7 ft. gray silty sand
    w/gravel and shell