alt
    v
    HOLE 10
    1<'lT_R
    1. PROJECT
    DEPARTMENT
    OF THE
    ARMY
    \
    SHEET
    OF
    Viola Ship Channel
    DIVISIOI
    luallate::cc
    2. LOCATION
    (coorouJ.t •• or .:.utJOft)
    ,',
    IISTALLATIOI
    .jaly Dist
    tEns
    Djy
    r>,
    "h,.;~,;
    ".~
    l'iIlIlJnn
    (;
    ,
    DR ILL! NG lOG
    3' DRILLING AGENCY
    U. S. Army Corps of Engineers
    I, :'
    lJ..
    HOLE NO.
    (A-
    .n_" on
    dr•• Jn, r.lt
    I.
    eltd ,
    j
    1.8
    NO.)
    5.
    NAME
    OF DR ILLER
    "
    3ST-a
    Ross
    6'
    DIRECTION OF HOLE
    7. TH ICKNESS
    OF OVER-
    DR I LLED
    DEPTH OF
    c::J VERTICAL
    CJ
    IHCLINEO
    I
    ~;:~;~~l'''"
    8URDEN
    \8' DEPTH
    I NTO ROCK
    \9' TOTAL
    HOLE
    47.0
    10. SIZE AND TYPE OF BIT
    11. DATUM FOR ELEVATION SHOWN
    112' MANUFACTURER'S DESIGNATION OF DRILL
    (TBII
    or
    JlSL)
    13' TOTAL NO. OF OVERBURDEN SAMPLES TAKEN
    110. TOTAL
    r5' £lEV.
    \16.
    DATE HOLE
    o
    ISTUR.EO
    UNO,,,uK","
    I
    :gXf~ORE
    GROUND
    .
    1ST
    ARTED
    1
    CONPLETED
    1')1'>1
    WATER
    29 Dec
    29 Dec
    9
    17. ELEV. TOP OF HOLE
    18' TOTAL CORE RECOVERY FOR
    19. SIGNATURE OF INSPECTOR
    \
    BORING (II)
    ,
    ELEVATION
    O£ PTH
    ([GENt
    CLASSIFICATION OF MATERIALS
    ,
    i " ""
    i
    (D..eription)
    0.0
    'I:»'-~>
    3kS/
    Water
    \
    -
    37.3'
    "
    39. g..,,:
    Black gray clay v/soft w/sand
    ,'/~\
    w/some gravel
    39.0
    i"q
    ,S;'
    ,41~~
    ',--,
    -
    Light gray sandy clay plastic
    w/calc nod w!silty sand pocket
    :
    41.0 45.S-::
    Washed, silty sand w/clay pock'
    "
    :
    w/small gravel w/cal nod
    -
    45.5
    47.cr:
    Light gray gray silty sand
    r t;-
    f<>
    .,j,_
    w/layers of clay w/sandstone
    , ,'-
    and cemented sand pockets
    ...:
    45.5-46.0 No count
    :
    46.0-46.5
    22 blows
    -
    -
    46.5-47.0 20 blows
    -::
    .-
    Bottomed in above
    -
    Weight of hammer
    140i;
    -
    -
    Drop Dis tance - 30"
    -
    Tide gage 1.6 @ 7:50 AM
    -
    Tide gage 1.5 @ 2:45 PM
    .
    ...:
    -
    ....:
    -
    ..
    -=
    :
    =
    -
    -:
    =
    yP"
    :
    -
    -::
    -
    -=
    -
    -=
    -
    -
    -::
    -
    :
    -
    -
    --::
    -
    -::
    :
    -