v
HOLE 10
1<'lT_R
1. PROJECT
DEPARTMENT
OF THE
ARMY
\
SHEET
OF
Viola Ship Channel
DIVISIOI
luallate::cc
2. LOCATION
(coorouJ.t •• or .:.utJOft)
,',
IISTALLATIOI
.jaly Dist
tEns
Djy
r>,
"h,.;~,;
".~
l'iIlIlJnn
(;
,
DR ILL! NG lOG
3' DRILLING AGENCY
U. S. Army Corps of Engineers
I, :'
lJ..
HOLE NO.
(A-
.n_" on
dr•• Jn, r.lt
I.
eltd ,
j
1.8
NO.)
5.
NAME
OF DR ILLER
"
3ST-a
Ross
6'
DIRECTION OF HOLE
7. TH ICKNESS
OF OVER-
DR I LLED
DEPTH OF
c::J VERTICAL
CJ
IHCLINEO
I
~;:~;~~l'''"
8URDEN
\8' DEPTH
I NTO ROCK
\9' TOTAL
HOLE
47.0
10. SIZE AND TYPE OF BIT
11. DATUM FOR ELEVATION SHOWN
112' MANUFACTURER'S DESIGNATION OF DRILL
(TBII
or
JlSL)
13' TOTAL NO. OF OVERBURDEN SAMPLES TAKEN
110. TOTAL
r5' £lEV.
\16.
DATE HOLE
o
ISTUR.EO
UNO,,,uK","
I
:gXf~ORE
GROUND
.
1ST
ARTED
1
CONPLETED
1')1'>1
WATER
29 Dec
29 Dec
9
17. ELEV. TOP OF HOLE
18' TOTAL CORE RECOVERY FOR
19. SIGNATURE OF INSPECTOR
\
BORING (II)
,
ELEVATION
O£ PTH
([GENt
CLASSIFICATION OF MATERIALS
,
i " ""
i
(D..eription)
0.0
'I:»'-~>
3kS/
Water
\
-
37.3'
"
39. g..,,:
Black gray clay v/soft w/sand
,'/~\
w/some gravel
39.0
i"q
,S;'
,41~~
',--,
-
Light gray sandy clay plastic
w/calc nod w!silty sand pocket
:
41.0 45.S-::
Washed, silty sand w/clay pock'
"
:
w/small gravel w/cal nod
-
45.5
47.cr:
Light gray gray silty sand
r t;-
f<>
.,j,_
w/layers of clay w/sandstone
, ,'-
and cemented sand pockets
...:
45.5-46.0 No count
:
46.0-46.5
22 blows
-
-
46.5-47.0 20 blows
-::
.-
Bottomed in above
-
Weight of hammer
140i;
-
-
Drop Dis tance - 30"
-
Tide gage 1.6 @ 7:50 AM
-
Tide gage 1.5 @ 2:45 PM
.
...:
-
....:
-
•
..
-=
:
=
-
-:
=
yP"
:
-
-::
-
-=
-
-=
-
-
-::
-
:
-
-
--::
-
-::
:
-