1. 9. TOTAL DEPTH OF HOLE 60.0

      alt
      ....
      ,--,'
      __.n.._,,_•.
      ~_
      ~~@iIL
      lKW2
      '}tole No.
      3ST-311
      I
      DIVISION
      ..
      DRIU1NG LOG
      Southwestern
      ,
      1. PROJECT
      Sabine Neches Waterway
      2.
      LOCATION
      (Coordinates or Station)
      3.
      DRILLING AGENCY
      Dept of the Armv. GD
      4.
      HOLE NO.
      (As shown on drawing title
      and file number)
      S.
      NAME OF DRILLER
      Black
      Corps of Engineers
      3ST-311
      INSTALLATION
      =----
      Galv Dist. Eng Div
      10. SIZE AND TYPE OF BIT
      11.
      DATUM fOR ELEVATION SHOWN
      (TBM.
      or
      MSL)
      12.
      MANUFACTURER'S DESIGNATION OF DRILL
      13. TOTAL NO. OF OVERBURDEN
      SAMPLES TAKEN
      14.
      TOTAL NUMBER CORE BOXES
      1'5. ELEVATION GROUND WATER
      : DISTUUED
      : 2 Jars
      I
      SHEET
      OF
      SHEETS
      : UNDISTURBED
      : 28 Cont
      6.
      DIRECTION OF HOLE
      : STARTED
      : CoMPlETED
      o
      VERTICAL
      0
      INCLINED
      OeG. fROM VERT.
      16.
      DATE HOLE
      i
      11
      May
      i
      11 May 1967
      7.
      THICKNESS OF OVERBURDEN
      B.
      DEPTH DRILLED INTO ROCK
      17•
      ELEVATION TOP
      Of
      HOLE
      lB.
      TOTAL CORE RECOVER'y fOR BORING
      19.
      SIGNATURE OF INSPECTOR
      9.
      TOTAL DEPTH OF HOLE
      60.0
      ELEVATION
      ,
      0.0
      2.0
      4.0
      6.0
      8.0
      10.0
      12.0
      14.0
      16.0
      18.0
      20.0
      22.0
      24.0
      26.0
      28.0
      30.0
      32.0
      34.0
      36.9
      38.0
      40.0
      42.0
      c. ,,'
      DEPTH
      b
      2.0 -
      4.0 =
      6.0.....::
      8.0 -
      10.0-
      12.0-
      14.0:
      16 •.0-
      18.0-
      20.0:
      22.0=
      2~.-G-
      26.0=
      28.0-
      30.0=
      32.0=
      34.0:
      36.0:
      38.0=
      40.0-
      42.ir
      44.0=
      LEGEND
      CLASSIFICATION OF MATERIALS
      (Des,ription)
      d
      Brown clayey sand, org.
      Brown sandy clay org, stiff
      Same as above, stiff
      Brown clay w/sand layers,
      stiff
      Gray and brown sandy clay,
      org, med
      Gray sandy clay, org, soft
      Gray clay, tr sand, medium
      Brown and
      gray clay, stiff
      Same as above, stiff
      Brown clay w/cal nods,
      v/stiff
      Brown clay, v/stiff
      Gray sandy clay, v/stiff
      Gray sandy clay w/cal nods,
      vis
      tiff
      Same as above, stiff
      Brown sand
      w/some
      clay layers
      stiff
      Brown clay w/silt and sand
      layers
      30.0-30.5 No blows
      30.5-31.0 6 blows
      31.0-31.5 7 blows
      31.5-32.0 No count
      Gray clay w/silt layers
      stiff
      Brown clay w/silt layers,
      stiff
      Same as above, stiff
      Same as above, stiff I.
      Brown silty clay, medium
      Gray and brown
      clay w/silt
      layers, stiff
      continued
      % CORE
      RECOV.
      ERY
      BOX OR
      SAMPLE
      NO.
      REMARKS
      (Drilling time, water loss, depth of
      weathering, et,., if signiji,ant)
      Jar 1
      Cont. 1
      1.50
      Cont. 2
      1.50
      Cont. 3
      1.00
      Cont. 4
      0.50
      Cont. 5
      0.25
      Cont. 6
      0.75
      Cont. 7
      1.25
      Cont. 8
      1.50
      Cont. 9
      2.00
      Cont. 10
      2.50
      Cont. 11
      2.25
      Cont.
      12
      2.25
      Cont. 13
      1.50
      Cont. 14
      1.50
      Jar 2
      Cont.
      15
      1.25
      Cont. 16
      1.25
      Cont.
      17
      1.50
      Cont. 18
      1.75
      Cont. 19
      0.75
      Cont. 20
      1.25
      '"
      ENG FORM
      1836
      1 APR 63
      PREVIOUS EDITIONS MAY BE USED
      (EM IJJD-J-JBOl)
      I<
      GPO
      un :
      OF-712-211S
      PROJECT
      Sabine Neches
      Waterway
      I
      HOLE
      NO.
      3ST-311

      alt
      '"
      ...
      ---- ...._.
      ....... .L.- ....
      .LJ.. .. uUUL
      UJ
      I
      DIVISION
      INSTALLATION
      I
      ~HEET
      DRILtlNG LOG
      S~···"
      e
      t:!01 .. n< 0"
      R~a
      Div
      OF
      SHEETS
      ti_
      ...
      1. PROJECT
      10. SIZE AND TYPE Of BIT
      "oh< na
      Ma~hao
      r.'o"
      2. LOCATION
      (Coordinates or Station)
      11. DATUM FOR ELEVATION SHOWN
      (TBM
      or
      MSL)
      12. MANUFACTURER'S DESIGNATION OF DRilL
      3. DRILLING AGENCY
      .
      • UNOISTURBED
      13. TOTAL NO. OF OVERBURDEN
      r
      DISTURBED
      4. HOLE NO.
      (As shown rm drawing tit'e
      .
      SAMPlES T"KEN
      .
      !
      .
      and file number)
      ..
      .
      S.
      NAME Of DRILLER
      14. TOTAL NUMBER CORE BOXES
      .
      -
      1'5. ELEVATION GROUND WATER
      6. DIRECTION OF HOLE
      jSTARTED
      !
      COMPLETED
      16. DATE HOLE
      o VERTICAL
      o
      INCLINED
      om. FROM VERT.
      17. ELEVATION TOP OF HOLE
      7, THICKNESS Of OVERBURDEN'
      18. TOTAL CORE RECOVER'y FOR BORING
      .
      "I~
      8. DEPTH DRILLED INTO ROCK
      19. SIGNATURE OF INSPECTOR
      9. TOTAL DEPTH Of HOlE
      CLASSifiCATION OF MATERIALS
      % CORE
      BOX OR
      REMARKS
      ELEVATION
      DEPTH
      LEGEND
      (Description)
      RECOV.
      SAMPLE
      (Drilling lime, waler loss, deplh 0/
      ERY
      NO.
      weathering, tic.,
      if
      significant)
      0
      b
      ,
      d
      f
      44.0
      --
      Same as above,
      stiff
      21
      r-
      46.0_
      Cont.
      1.25
      r=
      -
      46.0
      48.~
      Gray clay w/few silt layers
      l-
      f--
      stiff
      Cont.
      22
      1.25
      r-
      -
      r=
      -.
      I=-
      48.0
      50.-e:.
      Same as above,
      stiff
      Cont. 23
      1.50
      I-
      50.0
      ,=
      Gray clay, stiff
      Cont.
      24
      52.0_
      1.25
      r=
      -
      f:-
      52.0
      54.0=
      Gray clay, stiff
      Cont. 25
      1.50
      ~
      54.0
      56.-e::
      =
      Gray clay, stiff
      Cont. 26
      1.25
      f--
      r-
      ~
      "=
      I-
      56.0
      58.0_
      Gray clay, stiff
      Cont. 27
      1.25
      I=-
      r-
      -
      58.0
      60.0::
      Gray clay, stiff
      Cont. 28
      1.50
      r-
      -
      r-
      -=
      BOTTOMED
      f--
      -
      r=
      -
      f-
      --=
      I=-
      =
      -
      r-
      ~
      --=
      I=-
      =
      r-
      =
      r-
      -=
      f--
      r-
      =
      r-
      --=
      I=-
      =
      r-
      :
      r=
      r-
      -=
      f--
      r-
      =
      r-
      -=
      I=-
      =
      -
      ~
      .
      --=
      -
      f--
      ~
      -
      r-
      -=
      -
      =-
      --=
      -
      f:
      -
      ~
      -
      f:
      --=
      \
      f-
      -
      r=
      -
      I-
      -
      f-
      -
      r=
      -
      I
      -
      -
      ~
      ENG FORM
      1836
      PROJECT t
      aO:Lne
      l~ecnes
      IHOLE NO.
      I APR 63
      PREVIOUS EDITIONS MAY BE USED
      (EM 1110-1-1801)
      Waterway
      3ST-311
      11"
      GPO ItU : 0'-112-:75

      alt
      ,1':-;""
      >;~,"
      ~r
      \\
      WI;
      "Ii-
      SWG Form 261(C)
      28 Jan 1965
      "
      PROJECT: 5:,///"
      /v;::"
      /c., ..,
      k/o,kn'/~'y
      LOCATION: ____________
      ~
      __
      ~
      ________
      ~
      ___
      ,
      o
      z
      9
      ~
      ""
      p::
      H
      ~
      '"
      BOTTOM
      AT~
      WA'J'ER AT _ ,:"'_
      CLASSIFICATION
      ELEVATION TOP BORING
      ~~~~
      ~
      tJ
      Z
      '-<f@
      ~
      .4
      0
      ""
      H
      E-t~
      ~
      en
      H
      [,';lH
      en
      g[2l
      en
      6
      "'''''
      (,)
      '"
      TEST
      DATA
      SUMM,I,RY
      ,
      H.-..
      ~
      f,'ge
      ~~
      H
      ,
      "'''''
      ~E-1
      "
      ~~
      ~ ~I
      '
      .en
      ""
      Q
      U
      • .4
      ,
      ~5
      ~~
      .4
      E-<.4
      :><
      '
      15 P-
      enPQ
      (,)
      .4
      ,
      '"
      ,'- ,..---
      ".:.:.-'
      \,'
      BORING NO. _', .,
      I
      ", ,!
      i
      '<::-
      DATE DRILLED-LL,O'
      /c".;>(/
      /.:),~
      '/
      7
      SIEVE ANALYSIS
      0>:
      ~
      PERCENT
      -
      ~-~CC.
      WT.
      RTND.
      I
      ;;i ...:i
      en.
      SIEVE NO. (3)
      HOWE-!
      i
      i
      :>
      Z
      Z
      H
      '"
      ...:
      H
      Z
      e",
      tf)
      iii'
      H
      ~....::r;'::'rl
      ,
      .0
      9
      lool§~I§~
      TI-rF.'l-
      ~d
      ,f//'7<..::J""cJ:/
      ,-/-.-)\/ 0 - 2:
      CL
      21 ---
      16.00
      ;>(,
      76
      ";-0"")
      a
      ~)
      1/",
      1
      c-/
      2-4
      A>~'~)7
      C/,e:,0/
      ?.../8
      10./ STI;,25
      28 92.
      '
      j
      '-S'I.Hi-=
      '-2\~-6
      ____r
      ,"::=;J,?d
      /".-:;},/~<
      / __.
      <-.9.rYJ
      U
      T
      1/,01
      (J,?5.
      --
      14-1
      27
      1841
      .s,:;
      [20,0
      16J'2 r
      o
      "-{I
      9')10
      In!
      C)~I
      J
      0-
      4
      ..9-10
      &a;:/
      <-;'>/Jdt/ c-k'7,/
      "5i-/o
      ICL...LI:'i'.li2,s
      ?~
      93
      /5..oQ .L(:,
      ,94
      v)
      0 _0
      n
      P
      I:
      /\-)' 0-12
      IG>-8t1
      ,.,//A/,~-::;;~n//
      /0 ..-/?:
      S'/VI
      <')
      ?,)5
      1?4 /()7.
      ;<..0
      LC2.
      5c.;·4i~ :~;2)
      ,/)
      (')
      ~~
      .
      t:'.;6 lZ-14
      ~,....-,.;:$\/
      r/8\/
      /2 -
      2 Z
      10-1 M .. IO,7,)
      ?S
      /!J:')
      'j,
      e-
      7
      fLli~
      16
      /
      /
      ,..I.
      lb:2..
      3
      I
      c?(
      rc=,S 6-185TV,5' 28
      C;S
      ;::.3,0
      (') 4- 9(c,,<>I(J (')
      (j
      :2'..
      I
      IC.S' 8-20
      JIST <).7';
      25 1 ::';2_
      I
      r.:..'-l'~O-22
      .!LiT
      2,1:
      31
      9';
      i
      '/\
      ~-/!
      2-24'
      r-:-~'c71/
      ,.:J2r/,,)
      di/
      C/<8'I/
      ZZ
      -
      CL '/ST,?,h
      17
      )yi
      ,-:zs
      ,/2,0
      ,'J
      ::jf ';'(;')':'
      a
      1
      I / c;-
      I'
      ~1
      ":/2
      ~4-26
      Z
      8
      /
      /
      /
      1,,1,71
      :;>,7(
      1(..
      If Ir
      I
      '-/.-:( 6-28
      ca/
      A/c::1C7'<
      """2-,::,"",'::;"
      ,
      ~7
      /,7<;
      ,19!
      1/:,
      i
      ,!!.J4
      8-30
      "7"""0<',
      h~7
      "r?'r/n/;/ ;//Y 7c,?..3C ML S
      /<:(
      23
      Jill
      o,()
      a
      .c::V} 60.:.::',>')
      a...._o
      C) ,:0'.0 I
      !J-Zo-32
      (-/'~')Vc/'::';;1/2k/"4,,:
      IrH
      :':<z.
      !'
      V':ft;
      2-34
      /
      /,
      5"( /,5
      ,),,'1, ,;::;'8
      ',1'700 0
      kV,,"r.'.
      ()
      (
      ,.-,
      r)
      /1-/6
      4-36