alt
    TOIVISION
    DRILLING LOG
    I
    Southwestern
    1. PROJECT
    GIWW Colorado River - Matagorda Bay
    2. LOCATION
    (Coordinates or Station)
    3. DRILLING AGENCY
    Dept of the Army, GD, Corps of Engineers
    4~
    HOLE NO.
    (As shown on drawing title
    andlUe number)
    5. NAME OF DRILLER
    Black
    6. DIRECTION OF HOLE
    3ST-B
    o VERTICAL
    0
    INCUNEO
    PEG. FROM VERT.
    7. THICKNESS OF OVER8URDEN
    8. DEPTH DRILLED INTO ROCK
    9. TOTAL DEPTH Of HOLE
    ELEVATION
    DEPTH
    LEGEND
    22.0
    CLASSIFICATION OF MATERIALS
    (Description)
    Hole No. 3ST-B
    INSTALLATION
    Galv Dist, Eng Div
    TsHEET
    IOF
    SHEETS
    10. SIZE AND TYPE OF 81T
    11. DATUM FOR ELEVATION SHOWN
    (TBM
    or
    MSL)
    Sta. 472tOOO.South Side Channel
    12. MANUFACTURER'S DESIGNATION OF DRILL-
    13. TOTAL NO. OF OVERBURDEN
    SAMPLES TAKEN
    14. TOTAL NUMBER CORE BOXES
    1'5. ELEVATION GROUND WATER
    : STARTED
    : DISTURBED
    :2
    T~'r~
    16. DATE HOLE
    i
    30 Nov
    17. ELEVATION TOP Of HOLE
    18. TOTAL CORE RECOVERY FOR BORING
    19. SIGNATURE OF INSPECTOR
    1
    UNDISTURBED
    : COMPLETED
    i
    30 Nov 66
    % CORE
    RECOV.
    ERY
    BOX OR
    REMARKS
    SAMPLE
    (n,-i/ling lime, water loss, depth of
    NO.
    weathering, elc., if significant)
    b
    d
    e
    9
    0.0
    15.0
    1B.0
    20.0
    15.
    Water
    lB.
    Gray mucky clay v/soft
    Penetrated w/ke11y and weig
    2 drill rods
    Jar 1
    20.
    Brown silty sand, loose
    Jar 2
    22.
    Same as above,
    1 blow