,
Hole No.
3ST-3
TOIVISION
DRILLING LOG
I
Southwestern
1. PROJECT
"ThTh! colorado River to Matagorda Bay
2. LOCATION
(Coordinates or Station)
3. DRILLING AGENCY
Dept of the Army, GD, Corps of Engineers
4. HOLE NO.
(As shown on drawing title
and file number)
S.
NAME OF DRILLER
Black
6. DIRECTION OF HOLE
~'::'l'_~
o VERTICAL
0
INCLINED
OfG. fROM VERT.
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAl DEPTH OF HOLE
22.0
INSTALLATION
Galv Dist, Eng Div
1O. SIZE AND TYPE
OF
BIT
11. DATUM FOR ELEVATION SHOWN
(TBM
or
MSL)
Sta
462tOOO
on North Side
12. MANUFACTURER'S DESIGNATION OF DRILL
13. TOTA.L NO. OF OVERBURDEN
SAMPLES TAKEN
14. TOTAL NUMBER CORE BOxeS
1-5.
ELEVATION GROUND WATER
: STARTED
: DISTURBED
:4 Jars
16. DATE HOLE
i
29 Nov
17. ELEVATION TOP Of HOLE
18. TOTAL CORE RECOVERY FOR BORING
19. SIGNATURE OF INSPECTOR
I
SHEET
OF
SHEETS
Channel
!
UNDISTURBED
:
COMPLETED
i
29 Nov 1966
REMARKS
ELEVATION
DEPTH
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
%
CORE
RECOV.
ERY
BOX OR
SAMPLE
NO.
(D"i/ling time, waler loss, depth 0/
weathering, elc.,
if
significant)
Q
0.0
9.9
13.5
17.0
20.0
ENG FORM
I APR 63
b
9.9=
13...5-
17.6-
20.6-
22.Q:
1836
d
Water
Gray
mucky clay, v/soft
Gray mucky clay, v/soft
Note - 3" ST w/weight
of Kelly and 2 drill
rods penetrated
Tan gray mucky clay,soft