alt
    \I
    TOIVISION
    DRILLING LOG
    1 Southwestern
    1. PROJECT
    CTI,TIJ
    ~olorado
    River - Matagorda Bav
    2. LOCATION
    (Coordinates Qr Station)
    3. DRILLING AGENCY
    Dept of the Army, GD, Corps of Engineers
    4: HOLE NO.
    (As shown on drawing title
    and file number)
    5. NAME Of DRILLER
    Black
    6. DIRECTION OF HOLE
    o
    VERTICAL
    o
    INCLINEO
    7. THICKNESS OF OVERBURDEN
    8. DEPTH DRILLED lNTP ROCK
    9. TOTAl DEPTH OF HOLE
    ELEVATION
    DEPTH
    LEGEND
    ,
    b
    ,
    0.0
    =1
    113.9-:
    3ST-6
    oro. FROM VERT.
    22.0
    CLASSIFICATION OF MATERIALS
    (Description)
    d
    Water
    Hole No.
    3ST-6
    I
    SHEET
    OF
    SHEETS
    INSTALLATION
    Galv Dist, Eng Div
    Sta.
    468fOO,
    .South Side Channel
    12. MANUFACTURER'S DESIGNATION OF DRILL
    13. TOTAL NO. Of OVERBURDEN
    SAMPLES TAKEN
    14. TOTAL NUMBER CORE BOXES
    1-5.
    ELEVATION GROUND WATER
    : STARTED
    : DISTURBED
    !
    2 Jars
    16. DATE HOLE
    :
    30 Nov
    17. ELEVATION lOP OF HOLE
    18. TOTAL CORE RECOVERY FOR BORING
    19. SIGNATURE OF INSPECTOR
    :
    UNDISTURBED
    !
    1 Cont
    : COMPLETED
    !
    30 Nov 66
    % CORE
    REMARKS
    RECOV-
    ERY
    SOX OR
    SAMPLE
    NO.
    {D"illing time, water loss, depth of
    weathering, etc., if significant}
    13.9117.5::
    Gray mucky clay, v/soft
    Jar
    1
    17.5120.5-
    Gray mucky clay, v/soft
    Jar 2
    %
    20.5122.0-
    Gray sandy clay, v/stiff
    Cont. 1
    2.00
    BOTTOMED
    TIDE 1.7 @ 9:30 AM
    I
    ,-