!DIVISION
DRILLING LOG
I
Southwestern
1. PROJECT
GIWW Colorado River - Matagorda Bay
2. LOCATION
(Coordinates or Station)
3. DRILLING AGENCY
Dept of the Army, GD, Corps of Engineers
4. HOLE NO.
(As shown on drawing title
and file number)
5. NAME OF DRILLER
Black
'lI6.
DIRECTION OF HOLE
, 3ST-18
o
VERTICAL
0
INCLINED
oro. FROM VERT.
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9, TOTAL DEPTH
Of
HOLE
22.0
ELEVATION
DEPTH
LEGEND
o
b
0.0
15.0
Water
CLASSIFICATION OF MATERIALS
(Description)
d
Hole
No.3ST-18
INSTALLATION
Galv Dist, Eng Div
I
SHEET
OF
SHEETS
10. SIZE AND TYPE OF BIT
11. DATUM FOR ELEVATION SHOWN
(TBM
or
MSL)
Sta.
4981000
South Side Channel, Offset
12. MANUfACTURER'S DESIGNATION OF DRILL
-W-orth
13. TOTAL NO. Of OVERBURDEN
SAMPLES TAKEN
14. TOTAL NUM8ER CORE BOXES
1'5. ELEVATION GROUND WATER
: STARTED
: DISTURBED
i
3 Jars
j UNDISTURBED
: COMPLETED
16. DATE HOLE
2 Dec
i
2 Dec 1966
17. ELEVATION TOP OF HOLE
18. TOTAL CORE RECOVERY FOR BORING
19. SIGNATURE OF INSPECTOR
% CORE
RECOV.
ERY
•
SOX OR
SAMPLE
NO.
REMARKS
(DI'ming time, water loss, depth of
weathering, etc.,
,
if
significant)
125
%
15.0
17.5
Gray clay, v/soft
Jar 1
0.0
17.5
20.0
20