alt
    Hole No.
    3ST-25
    I
    DIVISION
    DRILLING LOG
    Southwestern
    I
    SHEET
    OF
    SHEETS
    INSTALLATION
    Galv Dist, Eng Div
    1. PROJECT
    10. SIZE AND 1:YPE Of BIT
    o lorado River
    11. DATUM FOR ElEVATION SHOWN
    (TBM.
    or
    MSL)
    2. LOCATION
    (C",dina"", Station)
    Sta.
    512,1000
    North Bank, Offset 10.0 North
    3. DRILLING AGENCY
    Deot of the Armv. GD
    4. HOLE NO.
    (As shown on drawing litle
    and file number)
    S.
    NAME OF DRILLER
    Black
    6. DIRECTION OF HOLE
    D
    VERTICAL
    o
    INCLINED
    7. THICKNESS OF OVERBURDEN
    8. DEPTH DRILLED INTO ROCK
    9. TOTAL DEPTH Of HOLE
    Corps of Engineers
    3S'l'-25
    DEG. FROM VERT.
    12. MANUFACTURER'S DESIGNATION OF DRILL
    13. TOTAL NO. OF OVERBURDEN
    SAMPLES TAKEN
    • DISTURBED
    1
    Jar
    14. TOTAL NUMBER CORE BOXES
    1'5. ELEVATION GROUND WATER
    : STARTED
    16. DATE HOLE
    i
    6 Dec
    17. ELEVATION TOP Of HOLE
    18. TOTAL CORE RECOVERY FOR BORING
    19.
    SIGNATURE OF INSPECTOR
    , UNDISTURBED
    1 Cont
    : COMPLETED
    i
    6 Dec 1966
    %
    22.0
    CLASSIFICATION OF MATERIALS
    (Des&riplion)
    %
    CORE
    RECOV-
    ERY
    BOX OR
    ROO'''M''A''''''K'''-------I
    ELEVATION
    lEGEt:,m
    SAMPLE
    (DI.ming time, water loss, depth of
    NO.
    weathering, el&., ;f s;gniji&anl)
    0
    b
    d
    f
    g
    0.0
    16.~
    16.2
    19.2
    19.5
    I
    22.J:!
    Water
    Gray mucky clay v/soft
    No resistance
    Brown silty sand
    BOTTOMED