Hole No.
3ST-25
I
DIVISION
DRILLING LOG
Southwestern
I
SHEET
OF
SHEETS
INSTALLATION
Galv Dist, Eng Div
1. PROJECT
10. SIZE AND 1:YPE Of BIT
o lorado River
11. DATUM FOR ElEVATION SHOWN
(TBM.
or
MSL)
2. LOCATION
(C",dina"", Station)
Sta.
512,1000
North Bank, Offset 10.0 North
3. DRILLING AGENCY
Deot of the Armv. GD
4. HOLE NO.
(As shown on drawing litle
and file number)
S.
NAME OF DRILLER
Black
6. DIRECTION OF HOLE
D
VERTICAL
o
INCLINED
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH Of HOLE
Corps of Engineers
3S'l'-25
DEG. FROM VERT.
12. MANUFACTURER'S DESIGNATION OF DRILL
13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
• DISTURBED
1
Jar
14. TOTAL NUMBER CORE BOXES
1'5. ELEVATION GROUND WATER
: STARTED
16. DATE HOLE
i
6 Dec
17. ELEVATION TOP Of HOLE
18. TOTAL CORE RECOVERY FOR BORING
19.
SIGNATURE OF INSPECTOR
, UNDISTURBED
1 Cont
: COMPLETED
i
6 Dec 1966
%
22.0
CLASSIFICATION OF MATERIALS
(Des&riplion)
%
CORE
RECOV-
ERY
BOX OR
ROO'''M''A''''''K'''-------I
ELEVATION
lEGEt:,m
SAMPLE
(DI.ming time, water loss, depth of
NO.
weathering, el&., ;f s;gniji&anl)
0
b
d
f
g
0.0
16.~
16.2
19.2
19.5
I
22.J:!
Water
Gray mucky clay v/soft
No resistance
Brown silty sand
BOTTOMED